Ask Lasest Price | |
Brand Name : | ZBR |
Model Number : | ZBR-S-1082 |
Certification : | CE ISO |
Price : | Negotiated |
Payment Terms : | Negotiated |
Supply Ability : | 10 sets per month |
Delivery Time : | 30 days |
Steel Silo Corrugated Side Panel Roll Forming Machine supplier
Features
1. Large capacity
One single-silo capacity is up to 17,000 tons with comprehensive configurations to meet customers’ different requirements.
2. High accuracy
Complete advanced processing equipment and technology are introduced from USA to effectively ensure working accuracy and reduce damage to galvanized layer.
3. Less residues
External installable stiffeners contribute to less grain residues on silo walls.
4. Detachable and movable
With standardized and modularized production, components and parts have a high standardization and good interchangeability, thus can be partially replaced or completely transferred.
Component
De coiler
Material width adjusting and guiding equipment
Roll former
Curving equipment
Cutting machine
Hydraulic control system
Technical process
Decoiling →Guiding→Cutting→Roll forming→Curving equipment
A. The technique data
1 Materials : 1.5-4mm galvanized G450 coating coils, 275 to 450 mpa
yield.
Feeding width: 1290 for 4mm 1293 for 2.5mm 1297 for 0.8 mm
2 Forming steps: about 18 stations
3 Material of rollers: Gcr15 steel precision-machined, high
frequency quenching HRC58-62
4 Material of main shaft : 45# high quality steel (diameter>¢50)
5 Cutting: hydraulic cutting; quenching HRC58-62
6 Electronic control: PLC control Panasonic Brand
7 Dimension of machine: 11500mmX1350mmX800mm
8. Working speed:5-8m/min
9 Drive system: gear box drive
10 Main motor power: 90kw
11. Punching moulds: 3 sets of punching dies at one time
12. Curving machine: Curving continuously to make the sheets
straight, the min Radius 1.8m,
the Radius can be adjustable.
13. Cutting: Hydraulic cutting
14. Hydraulic station power 55kw, the pressure 25-30Mpa.
15. Out table: lift auto stacker
B. Machine list
Number | Machine list | Number |
1 | 5 tons manual decoiler | 1 set |
2 | Feeding&leveling device | 1 set |
3 | Gear box drive system | 1 set |
4 | Main forming machine | 1 set |
5 | Curving device | 1 set |
6 | Hydraulic Cutting device | 1 set |
7 | Auto stacker 6 meters | 1 set |
8 | PLC control system | 1 set |
9 | Hydraulic station | 1 set |
C. Working Flow of Roll Forming Machine
De-coiler-feedingwithguide→Straighteningdevice→mainrollformingmachine→Curving
device→run out table
1.Passive
Decoiler..........................................................To
load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the
heavy material.)
2.Servo Feeding
Applicator............................................To feed the
material accurately
3.Hydraulic/Press
Punching...........................................To punch as
requirements
4.Roll Forming
Unit.........................................................To
roll form as requirements
5.Hydraulic
Cutting.........................................................To
cut sheets as desired length
(We also have non-stop hydraulic cutting system.)
6.Output
Table................................................................Support
the finished products
D. Advantage of machine
1. Reasonable Price
2. High Quality
3. 12 Months Warranty
4. More Than 10 Years Experience
5. Durable
6. Reliable
E. Warranty, Year warranty.
During the warranty period, maintain and change the spare parts for
the customers for free (except for the instrument damage caused by
human factors or natural disasters. ) And provide technical support
for life-long.
We can design and manufacture the machine according to clients'
request! Our machines have passed CE, Guaranteed quality. Please
send us the enquiry with Profile Drawing.
F. After-sale Serive
- The seller take responsibility to installation and commissioning
of the equipment and free training. After machine arrive the
destination, by the request of the buyer , the seller will provide
1 technical engineer to guide installation and training , and the
buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation
by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should
pay for installation and commissioning fee 100$/day to the point
account of the seller. The two-way ticket,visa, food, hotel , the
translator and insurance are all should provide by buyer with full
responsibility.
-The seller supply technical data (including forming mould drawing,
electrical elements drawing and equipment drawing etc.)
Friendly Links: www.everychina.com
Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们